Campion School & Language College

Flat Roof Replacement – £1.15m Previous Next PROJECT MANAGEMENT AA Projects SCOPE Existing roof included strammit deck was removed. Full re-roof utilising Bauder’s Bauderflex System and cut to falls insulation. 20 year guarantee offered by Bauder. New TATA steel decking installed over existing concrete beams on “top-hat” sections. All rooflights, projectors, and fire protection upgraded. […]

Leamington College – Old Ceramics Building

Full Refurbishment – £640k Previous Next PROJECT MANAGEMENT Ridge and Partners LLP SCOPE Higham were engaged to completely refurb the Old Ceramics Building and provide a new workshop learning space. The old asbestos cement roof was completely removed and replaced with a new insulated Kingspan Roof. New internal rooms included workshops, classrooms, IT suite’s and […]

Welland Park Academy

Internal Refurbishment – £520k Previous Next PROJECT MANAGEMENT Surveyors 2 Education SCOPE Higham successfully tendered for works to completely re-design the existing school sports hall into a new canteen. The project was completed during term time and allowed a prompt switch from the existing school canteen. Higham worked alongside the school’s choosen kitchen provider to […]

Fordham CE Primary School

New Build, Timber Frame – £425k Previous Next PROJECT MANAGEMENT Surveyors 2 Education SCOPE New building was erected using a Timber Frame System. Higham managed the full project from foundations up, including all M&E and fit out. This project has provided the school with 2 fresh new classrooms, and 3 new toilets.

Carlton Le Willows Academy

Flat Roof Replacement – £350k Previous Next PROJECT MANAGEMENT Surveyors 2 Education SCOPE Roof was replaced utilising Garland’s Stressply Signature system providing a 30 year manufacturers guarantee. Work was completed in phases to align with the schools budget. All scaffolding was erected at weekends to ensure no disruption to the school, deliveries also timed around […]

Cheltenham Bournside School

Flat Roofing Works – £615k PROJECT MANAGEMENT E3 Cube SCOPE 1700m² full strip and re-roof installing a tapered insulation scheme. Alumasc Derbigum Olivine membrane installed offering a 35 year warranty. All rooflights replaced bringing them up to current building standards. Higham have worked closely with the school to ensure work’s were completed during term time.

We use cookies on our site by continuing to browse our site, you agree to the use of these cookies. You can read our cookie policy and learn more here